Project in an eye clinic in the greater Hannover area

(Case Study)

Project in an eye clinic in the greater Hannover area

In the environment of AEMPs and larger clinics, the topic of sterile processing is an essential element in ensuring proper operation, protection of the instruments used and the associated patient safety.

In mid-December 2021, the experts from Gebrüder Heyl Vertriebsgesellschaft received an order to quickly determine the cause of a defective water treatment system in a group ophthalmology practice in the greater Hanover area. Urgent action was required because the clinic currently has 9 resident doctors and the treatment and care of patients must be ensured at all times.

Within the scope of the technical assessment, it was determined that a booster pump was the cause of the problem. Through a targeted on-site analysis of the relevant water parameters and the instrumentation used, it was determined at the same time that the existing plant did not ensure the necessary quality of the ultrapure water for the downstream processes and treatment steps.

On the recommendation of our experts, a blending bed designed to meet current demand with highly sensitive monitoring was installed as an interim solution. This enabled the necessary security of supply to be restored within a very short time.

Projekt in einer Augenklinik im Großraum Hannover

At the same time, based on the data collected, a precise design for a new ultrapure water treatment plant meeting modern and future requirements was projected and subsequently presented to the customer.

Based on the inventory, it was decided to implement the concept immediately. In addition to the system being completely tailored to the needs of the eye clinic with regard to the required volumes, the latest monitoring technology was also integrated into the concept in the course of the design. In addition to high-precision conductivity monitoring and UV disinfection with circulation via the supply tank, the Testomat® 808 SiO2 was integrated as a measuring device for the supply side, which continuously monitors the silicate content and ensures that the limit value of 0.4 mg/l for the ultrapure water of a steam generator, as recommended by AKI (Arbeitskreis Instrumentenaufbereitung), is not exceeded. Due to their chemical structure, silicate deposits are a risk for the entire subsequent process. The damage is elementary and extremely difficult to eliminate by mechanical or chemical processes. In the case of instrumentation, the damage has a massive effect on the service life of the instruments.

Already in mid-February 2022, with the assistance of our service partner, the technical installation took place and the new system was put into operation within one day. The timing is such that the ongoing operation of the eye clinic ran without interruption.

The already installed mixed bed cartridges were kept in the system as a safety backup for any maintenance.

As a result, in addition to solving the original problem, a modern concept was jointly implemented within a very short period of time, which, in addition to the economic benefits, also gives the highest priority to the issue of patient safety. The topic of water treatment in sensitive areas must always be considered independently of the basic water requirement. Even small quantities of improperly treated process water have a major impact.

Due to the professional and fast implementation, the eye clinic decided to put the maintenance of the system in the hands of the experts as well.

Here you can find the products used:

Plan your cost-optimized, individual plant concept now with our modular VE process water treatment plant